A. Level change sloping 0-70°
This Solution is applicable for Systems RockLink15, RockLink 24 and RockLink 24 FasTrac. Cut grid sections to appropriate length and shape. Connect using metal angle brackets and fixings. Clip tiles on sloping section at 300 mm centres when slope is >60°.

-
B. Level change vertical 90°
This solution is applicable for Systems RockLink 15, RockLink 24 and RockLink 24 FasTrac. Cut grid sections and position hangers as shown.

-
C. Floating ceiling with light integration
Floating ceiling incorporating optional light and counteracting rigid hanger (shown with dashed line). For the best aesthetics, hangers shall be positioned so that they are not seen from floor level, and the surrounding U-channels shall be fixed from the top to the grid using metal angle brackets, thereby avoiding visible fixings.